Customization: | Available |
---|---|
CAS No.: | / |
Formula: | / |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Test Item | Result | |
Drying time (25ºC) | Surface dry time: 1h; Ultimate dry time: 24h |
Fully cured in 7 days |
Using drier: 80-90ºC×30min | ||
Adhesive (scratch) | Grade 1 | |
Pencil hardness (HB) | H | |
Impact (50kg•cm) | Pass | |
Flexibility | 1mm | |
Corrosion resistance | >360h | |
Water resistance | >300h |
Composition | Component A (black liquid) | Specific gravity 1.33±0.05 |
Component B (brown liquid) | Specific gravity 1.01±0.03 | |
Mix proportion | Weight ratio | Component A:B = 6:1 |
Volume ratio | Component A:B = 4.5:1 | |
Mass solid content (105ºC×3h) | 45±5% | |
Mix method | After mixing component A, add component B and fully mix evenly | |
Coating thickness | Dry film thickness | 30-50μm |
Wet film thickness | 180μm | |
Diluent | Deionized water, add about 0~10% | |
Curing period(25ºC) | -- | |
Pot-life(25ºC) | 2h | |
Recoating interval | Minimum 4h Maximum 48h |
|
Pretreatment of substrate | When directly applied to the surface of the substrate, the substrate should be treated with phosphating, vitrification, and silanization, and it must be clean, dry, rust-free, and oil-free. | |
Substrate temperature | Substrate temperature should be higher than dew point by 3ºC | |
Construction Conditions | The construction temperature is 10-35ºC, the humidity is 30-75%, and the ventilation conditions are good. For construction in winter, it is recommended to preheat the workpiece and use hot air circulation to increase the surface temperature of the workpiece. Infrared heating can be used. |
|
Process | Substrate - Rust removal, degreasing, dust removal, phosphating, si-lane, vitrification treatment - Moisture drying - Spraying water-based paint - Leveling at room temperature for 5-10 minutes - Gradient heating, 90-100 degrees 30 minute artifact - Off-line packaging | |
Coating method | DISC electrostatic spraying: | Spraying voltage: 50 ~ 60 kV Spraying pressure: 0.35-0.45Mpa Construction viscosity: 16-20s (25-30ºC) |
Hand spraying: | Construction viscosity: 35-43s (25-30ºC) | |
Applicable substrate: | Suitable for cast iron, galvanized sheet, carbon steel, cast aluminum and other metal substrates | |
Clean | Wash tools and equipment with clean water immediately after construction | |
Storage life | The storage period of the paint is six months, please be sure to use it up within the storage period, so as not to affect the quality; the paint (including curing agent, thinner) should be sealed and stored in a cool place, waterproof, leakproof, sunscreen, high temperature, and away from fire . | |
Package | Component A: 18kg/barrel Component B: 3.0kg/barrel |